Difference between revisions of "Dam Repairs"

From Berne, NY - a Helderberg Hilltown
Jump to navigation Jump to search
m (Created page with "400px|thumb|center|<center>The dam at the start of reconstruction</center> Hurricane Irene struck Warner Lake in August of 2011 dumping over 13 inches of ...")
 
m
 
Line 22: Line 22:
 
Image:Repair_18.JPG|<center>Ready to pour</center>
 
Image:Repair_18.JPG|<center>Ready to pour</center>
 
Image:Repair_19.JPG|<center>Rebar in place for the corner</center>
 
Image:Repair_19.JPG|<center>Rebar in place for the corner</center>
Image:Repair_2.JPG|
+
Image:Repair_20.JPG|<center>Rear wall all formed and ready to pour</center>
 +
Image:Repair_21.JPG|<center>Rear of spillway all formed</center>
 +
Image:Repair_22.JPG|<center>North wing wall extension is all formed and ready to pour</center>
 +
Image:Repair_23.JPG|<center>View from behind the dam</center>
 +
Image:Repair_24.JPG|<center>More new forms</center>
 +
Image:Repair_25.JPG|<center>The concrete arrives</center>
 +
Image:Repair_25A.JPG|<center>Pumping concrete down to the new forms</center>
 +
Image:Repair_26.JPG|<center>New concrete wall</center>
 +
Image:Repair_29.JPG|<center>Forms for a new splash pad below the spillway</center>
 +
Image:Repair_30.JPG|<center>Project completed</center>
  
  
  
 
</gallery>
 
</gallery>
 
 
 
</div>
 
</div></li>
 
<li class="gallerybox" style="width: 155px"><div style="width: 155px">
 
<div class="thumb" style="width: 150px;"><div style="margin:30px auto;"><a href="indexab25-2.html?title=File:Repair_20.JPG" class="image"><img alt="" src="images/thumb/7/7e/Repair_20.JPG/120px-Repair_20.html" width="120" height="90" /></a></div></div>
 
<div class="gallerytext">
 
<center>Rear wall all formed and ready to pour</center>
 
</div>
 
</div></li>
 
<li class="gallerybox" style="width: 155px"><div style="width: 155px">
 
<div class="thumb" style="width: 150px;"><div style="margin:30px auto;"><a href="index3c4b.html?title=File:Repair_21.JPG" class="image"><img alt="" src="images/thumb/d/d8/Repair_21.JPG/120px-Repair_21.html" width="120" height="90" /></a></div></div>
 
<div class="gallerytext">
 
<center>Rear of spillway all formed</center>
 
</div>
 
</div></li>
 
<li class="gallerybox" style="width: 155px"><div style="width: 155px">
 
<div class="thumb" style="width: 150px;"><div style="margin:30px auto;"><a href="index31fd.html?title=File:Repair_22.JPG" class="image"><img alt="" src="images/thumb/5/56/Repair_22.JPG/120px-Repair_22.html" width="120" height="90" /></a></div></div>
 
<div class="gallerytext">
 
<center>North wing wall extension is all formed and ready to pour</center>
 
</div>
 
</div></li>
 
<li class="gallerybox" style="width: 155px"><div style="width: 155px">
 
<div class="thumb" style="width: 150px;"><div style="margin:30px auto;"><a href="indexa404-3.html?title=File:Repair_23.JPG" class="image"><img alt="" src="images/thumb/b/b3/Repair_23.JPG/120px-Repair_23.html" width="120" height="90" /></a></div></div>
 
<div class="gallerytext">
 
<center>View from behind the dam</center>
 
</div>
 
</div></li>
 
<li class="gallerybox" style="width: 155px"><div style="width: 155px">
 
<div class="thumb" style="width: 150px;"><div style="margin:30px auto;"><a href="index100a.html?title=File:Repair_24.JPG" class="image"><img alt="" src="images/thumb/9/97/Repair_24.JPG/120px-Repair_24.html" width="120" height="90" /></a></div></div>
 
<div class="gallerytext">
 
<center>More new forms</center>
 
</div>
 
</div></li>
 
<li class="gallerybox" style="width: 155px"><div style="width: 155px">
 
<div class="thumb" style="width: 150px;"><div style="margin:35px auto;"><a href="index3d00.html?title=File:Repair_25.JPG" class="image"><img alt="" src="images/thumb/2/28/Repair_25.JPG/120px-Repair_25.JPG" width="120" height="80" /></a></div></div>
 
<div class="gallerytext">
 
<center>The concrete arrives</center>
 
</div>
 
</div></li>
 
<li class="gallerybox" style="width: 155px"><div style="width: 155px">
 
<div class="thumb" style="width: 150px;"><div style="margin:35px auto;"><a href="indexf266.html?title=File:Repair_25A.JPG" class="image"><img alt="" src="images/thumb/d/d5/Repair_25A.JPG/120px-Repair_25A.html" width="120" height="80" /></a></div></div>
 
<div class="gallerytext">
 
<center>Pumping concrete down to the new forms</center>
 
</div>
 
</div></li>
 
<li class="gallerybox" style="width: 155px"><div style="width: 155px">
 
<div class="thumb" style="width: 150px;"><div style="margin:35px auto;"><a href="indexd951-2.html?title=File:Repair_26.JPG" class="image"><img alt="" src="images/thumb/5/51/Repair_26.JPG/120px-Repair_26.html" width="120" height="80" /></a></div></div>
 
<div class="gallerytext">
 
<center>New concrete wall</center>
 
</div>
 
</div></li>
 
<li class="gallerybox" style="width: 155px"><div style="width: 155px">
 
<div class="thumb" style="width: 150px;"><div style="margin:35px auto;"><a href="index8f4c-2.html?title=File:Repair_29.JPG" class="image"><img alt="" src="images/thumb/2/22/Repair_29.JPG/120px-Repair_29.html" width="120" height="80" /></a></div></div>
 
<div class="gallerytext">
 
<center>Forms for a new splash pad below the spillway</center>
 
</div>
 
</div></li>
 
<li class="gallerybox" style="width: 155px"><div style="width: 155px">
 
<div class="thumb" style="width: 150px;"><div style="margin:35px auto;"><a href="indexb064-2.html?title=File:Repair_30.JPG" class="image"><img alt="" src="images/thumb/0/02/Repair_30.JPG/120px-Repair_30.html" width="120" height="80" /></a></div></div>
 
<div class="gallerytext">
 
<center>Project completed</center>
 
</div>
 
</div></li>
 
</ul>
 
 
<!--
 

Latest revision as of 21:37, 18 November 2012

The dam at the start of reconstruction


Hurricane Irene struck Warner Lake in August of 2011 dumping over 13 inches of rain and causing a beaver dam on a stream on the north end of the lake to fail resulting in thousands of additional gallons of water to flood into the lake. All of this caused a rapid rise in the lake level to height never seen before. At one point over 2ft of water was going over the entire top of the dam. After the water level went down, an engineering study was done to determine the extent of the damage to the existing dam. A contractor was hired to make the necessary repairs as suggested by the engineer's report. The cost of the repairs was nearly $30,000. All dam repair photo's were taken by Lee Jones